SERVICES
PRE-DESIGN SURVEYS :
Soil Resistivity Survey & Soil Analysis.
Current Drainage Survey.
Identification of Ground bed location.
Collection of site data for sizing up an optimum design.
ENGINEERING DESIGN OF CP SYSTEMS :
Scheme an optimum solution.
Sizing up Design Methodology.
Drawing out Detailed Specification.
Preparation of Bill of Material.
Generation of Relevant Drawings.
Detailing the Quality Assurance Plan.
Installation and Commissioning procedures.
SUPPLY OF CP MATERIAL :
Transformer Rectifier Units.
High Silicon Iron Anodes.
Mixed Metal Oxide Anodes.
Different types of Reference Electrodes.
Varieties of Sacrificial Anodes.
CP Cables.
Polarisation Cells.
Zinc Grounding Cells.
Flange Insulation Kits.
Junction Boxes & Test Stations.
Other miscellaneous items.
INSTALLATIONS OF CP SYSTEMS :
Our Engineers are well trained to handle the installation of different types of CP System comprising of T/R Units.
Various types of Anode Ground beds like
Horizontal Anode Ground Bed.
Shallow Vertical Anode Ground Bed.
Deep Well Anode Ground Bed.
Associated civil works.
And other related activities.
TESTING AND COMMISSIONONG OF THE CP SYSTEM :
After carrying out the necessary cold checks, the CP System is energised.
Tests carried out to ensure the structure is adequately protected with necessary fine tuning.
Interference effect on the system as well as the other structures is studied and remedial measures implemented.
MONITORING OF EXISTING CP SYSTEM :
Effective monitoring of the system is carried out as per the pre determined procedure and on course correction is done to achieve the best results.
POST INSTALLATION SURVEYS :
Continuous Potential Logging to obtain close interval PSP readings.
DCVG Survey to assess the coating condition.
Pearson’s Survey to ascertain the coating condition.
CAT Survey.
TROUBLE SHOOTING AND REMEDIAL MEASURES :
Identification of Stray current Source.
Ascertaining the Interference.
Locating the Current Drainage to secondary structures.
Recommendation and Implementation of suitable remedial measures.